Engineering Workshop - Heating & Cooling
The Problem
The engineering workshop at a major food processing company in Bury St Edmunds had a requirement for heating in the winter, ventilation in the spring and autumn, and cooling in the summer. Separate systems were considered, but were expensive and difficult to control coherently, so a combined system was needed.
Click Below to see the solution.
"Worth every penny for the relief it has brought to an unbearably hot working environment." "Procool have been great to work with"
Basingstoke Head Teacher
Junior School"Thank you to you and your team for such a smooth installation"
Karen Taylor (Environmental Development Manager)
Hampshire Cosmetics"Before calling Procool we consistently had problems meeting the MHRA temperature regulations using our air conditioning system."
Pharmaceutical Distributor
Durbin PLC"We are very happy with the units provided, which are very effective"
Chris Timney
Riverside Bakery"Very pleased with the company"
John Laird
Gates Power Transmissions"Excellent! During the installation, they helped us keep our production schedules and helped us source the right heating system for our needs. The whole process was run very efficiently."
Tessa Still
Fife Engineering"We are very happy with the service provided."
Geoff Payton
Connors Seafoods











